The maintenance and operation project of Maanshan Changjiang River Highway Bridge is totally 20.22KM. The left main bridge adopts a 2×1080-meter three-tower two-span suspension bridge, and the right main bridge adopts a 2×260-meter three-tower two-span cable-stayed bridge. The north approach bridge (Hexian shore) is supported and continuously assembled pre-stressed concrete small box girder; Jiangxinzhou approach bridge is pre-stressed concrete cast-in-place continuous box girder; south approach bridge (Maanshan shore) is pre-stressed concrete cast-in-place continuous box girder and simple supported and structural continuous assembly pre-stress concrete small box girder.
The maintenance and operation project of Wangdong Changjiang River Highway Bridge is totally 3.6KM, and the main bridge is a 638m five-span semi-floating system cable-stayed bridge. The approach bridge is a pre-stressed concrete cast-in-place continuous box girder and a simple supported structure with continuous pre-stressed small concrete box girder.